Tencent meeting room: https://meeting.tencent.com/dm/NXVVKc7PPZSs
Meeting number: 695-8098-7502
General items.
ttWML analysis status:
ttHML analysis status:
QT:
I have ask for Nadezhda for how to add cut in shower shape variables to calculate ID efficiency. She told me that I can use the AsgPhotonsEMSelector tool.
Now I am trying to add the tool in TnP frameworks.
Tracker:
We have calculate the position resolution of W11 and W12 Silicon sensor. W11 ~ 7.1 um, W12 ~ 10.2 um.
Next step we can measure the IV and CV of W11 (The avalanche voltage is expected to be above 380V), and measure position resolution of another two designs 40(20), 30(15) after read board is ready.
1. Still writing the thesis, finished the part of chpt2 and chp3, summarizing the old result to write chp4.
2. About the new design of HCAL. We give a new judgment criteria that selects the nuclear process veto inefficiency to judge whether to add a Side HCAL.
3. I hav also already finished the code check and simulation work, waiting for chunxiang's result(3fibers version).
Anything else?