[2025-01-18] For better promotion of the events, the categories in this system will be adjusted. For details, please refer to the announcement of this system. The link is https://indico-tdli.sjtu.edu.cn/news/1-warm-reminder-on-adjusting-indico-tdli-categories-indico
Tencent meeting room: https://meeting.tencent.com/dm/NXVVKc7PPZSs
Meeting number: 695-8098-7502
General items.
for QT,
I am updating my code for calculating MC photon ID efficiency to add mc_total_weight in order to combine MCa,d,e ID efficiency. It is expected to be completed within this week.
I have started to write the note of my QT, It will be finished around mid-to-late August.
I am writing new script for calculate ID efficiency in new menu. It will be finished at early August.
for poster of Darkshine for CPAC2023,
Basically refer to the previously poster of Yufeng and Qibin. Considering the theme of the meeting, my focus is on the detector itself.
ATLAS Zgamma EFT Interpretation
Measurement of $p_{T}^{\gamma}$ distrbution almost finished
Production of Systematic inputs at reco-level is on-going ( 1D almost finished, 2D will start soon ), EFT fitting will be performed after systematic inputs finished
CEPC Zgamma EFT analysis
Sample production is on-going, 1D samples will be finished this week, 2D samples production will start next week and will takes around 2 weeks.
Some preliminary results are obtained ( statistic-only limits, cutflow results, kinematic comparison )
Systematics are developing now
H to Zgamma analysis
Checking JobOption files ( H to gammagamma ), working with Qiuping now on MC samples preparation ( ggFH, VBFH, VH, ttH with Rel 22 ), as well as validations
Anything else?