Today's focus:
[ZZy]:
- ZZy_FastFrames has been shared to the group. Only nominal configuration for now (SR). CR and VR would be discussed with analysis group members of interest.
- CP task started off well from our side thanks to Kang's efforts.
[ssWW]:
- Common ssWWjj_FastFrames branch for both Easyjet and VBSTool should be correct now. Merged request passed with all green, and with nominal config. for the CI.
[Full Run-3 Hyy*]:
- First version of Hyy* Easyjet framework is now ready, using the expertise from the HZy and ZZy.
- First validations SR yields are promising, with only little differences to be studied. Need to understand if the differences are framework related (same issue with ZZy currently) or if it is wrong implementation.
----------
[VBS_KappaLambda and Hyy*] abstracts:
- Both abstracts submitted.
[HIGP Derivation]:
- Serious monitoring needed last week for specific tickets.
[WWW review]:
- Comments made during the EB approval meeting.
Plans:
- [Full Run-3 Hyy*]: Continuing on the Easyjet side, produce plots for the kick-off. And focus on the merged electron ID studies again right after.
- [VBS_KappaLambda]: Will organise internal meeting soon.
- [ZZy]: Maintaining FastFrames, and having Rui join the maintenance. Starting framework validation as soon as possible, to start n-tuple production. Then start the effort on the signal part of the analysis [TDLI effort].
- [ssWW]: Once common branch is merged to master, will focus back to the unfolding.