[2025-01-18] For better promotion of the events, the categories in this system will be adjusted. For details, please refer to the announcement of this system. The link is https://indico-tdli.sjtu.edu.cn/news/1-warm-reminder-on-adjusting-indico-tdli-categories-indico
General items.
ttWML analysis status:
ttHML analysis status:
For Rel21
I have finished the data17, mc16d, data16, mc16a grid jobs.
I'm running the condor job of Create finely-binned histograms for shower shape distributions for photons and electrons. (I submit it on 11/6, now more then 60% completed. this is the most time-consuming step).
After that I can verify whether I can get the same ID efficiency measurement results as before.
For Rel22
I added some required shower shape variables to the new TnP frame. Now I am trying to figure out the working point for electron and photon selection.
For Silicon tracker
We have finished the IV test, and the CV test circuit has been set up. we will start the CV test this Friday.
Anything else?