Production
Positron Analysis:
Coorp with Yifan to work on seeding algorithm (until Jul.10)
DarkSHINE:
HCAL scintillator: understood the issue(low event rate, calibration difference) and performance of the electronic readout. Calibration will be done soonish, to calculate ADCcounts/N.P.E instead of ADCcounts/mV->N.P.E
H2a4b: preparing H->2a sample (a is LLP); preparation framework based on eastjet is on-going
Hzy/yy*: first look of spurious signal test using full lly Run3 bkg, it works, but so far no model can pass the test.