Run-3 DP search:
h2a4b:
HWW QE:
Xbb gbb calibration:
DarkSHINE:
HCAL hardware: successfully extend the two coincident trigger from 40 ns to 100 ns with a FPGA (in P.E test, two scintillator is used to proved trigger along with fifo and LTD)
4GeV optimization (HCAL related part): work with Chunxiang to define the cuts on HCAL related variables
H2a4b:
work with Xuliang to check LLP H2a4b signal, have shown to theorists and need to check more variables. also check other channel for H2a4b
work with Zelin/Zhen to keep develop the easyjet based framework
Hyy*/zy:
prepare workflow from signal WS -> spurious signal check -> prepare final WS for fitting