HWWlvlv QE:
GW-collider:
Run-3 DP search:
DS HCAL:
baseline 1.0 HCAL calibration: finalize the reproduction and update the result in CDR
mini-prototype: working on a 4-channel SiPM+pre-amplifier board, so far at least one channel can work, figuring out the issue of combination
variables for BDT: finalize the debug, adding to the framework
H2a4b:
preparing a MC request for LLP sample request
Hzy/yy*:
working on the note comments from EB, studying the strategy of obtaining the signal PDF (inclusive OR specific combination of processes)
Took the release shift during the 'holiday'
positron on target:
for beam energy @ 8GeV