Hyy* background modeling
- Spurious Signal test:
- Finished (based on Rui's latest report):
- observable mlly (110-160GeV)
- Max(S/δS) < 20% or Max(S±σS/δS) < 20% or Max(S/Ref_S) < 0.1
- Results: Low-mass ll only: c0/c3/c4 can not pass & Smoothed low-mass ll: only c0 can not pass
- Plan:
- extend the scan range to [105, 160] GeV
- repeat the SS test for each category
- to evaluate the difference in model results when using a wider range
- Sideband Plot for Background Template Preparation:
- Plot a sideband region distribution using data and the lowmass ee and μμ background mc samples.
- Use data driven methods to model other background processes and combine them with the lowmass ll background to build a more precise background template.
Zvvy Channel for nTGC study @ CEPC Full Simulation
- Update CEPCSW
- The current step is at the detector-level processing stage, including simulation, tracking, digitization and reconstruction
- start setting up the code framework for the later analysis