[2025-01-18] For better promotion of the events, the categories in this system will be adjusted. For details, please refer to the announcement of this system. The link is https://indico-tdli.sjtu.edu.cn/news/1-warm-reminder-on-adjusting-indico-tdli-categories-indico
会议主题:DarkShine HCAL 会议时间:2023/01/05 10:00-11:00 (GMT+08:00) 中国标准时间 - 北京 重复周期:2023/01/05-2024/06/27 10:00-11:00, 每周 (周四)
点击链接入会,或添加至会议列表: https://meeting.tencent.com/dm/uc1ynE9BiK5p
#腾讯会议:756-3825-9774
复制该信息,打开手机腾讯会议即可参与
Todo:
Phase space: Inclusive events after tracker's cut.
veto inefficiency: # of Events missed / # of Events with nuclear reaction
1.refer初步design,不用表达的如此强烈origin和new
2.Figure5 加个表格记录具体多少veto ineff
3. Figure7 caption mention absorber thickness
4. Figure8 前部闪烁体排布
5.Table3 caption 讲清楚,哪个是加side的哪个不加的
Table 3 Pion -> Pi0
Kaon-> Kaon0
https://codimd.web.cern.ch/umo5Ol0zR4mnYh3HgbMcYw