DarkSHINE:
CDR: modify the plots style and minor text update based on the discussion
HCAL:
- 4 channels mini-prototype test: SiPM board has issue, new materials received and will test
- B1.6 4GeV EOT analysis: study the new variables for HCAL, generating signal samples, several preliminary combinations of variables are selected, digging more
- HCAL calibration re-studying for B1.0/ studying for B1.6
Hzy/Hyy*:
- update INT note
- study the bkg modelling with new categorization, several cates can't pass the SS test
- validate the significance calculation with IHEP