[2025-01-18] For better promotion of the events, the categories in this system will be adjusted. For details, please refer to the announcement of this system. The link is https://indico-tdli.sjtu.edu.cn/news/1-warm-reminder-on-adjusting-indico-tdli-categories-indico

Shu's weekly group discussion

Asia/Shanghai
Tsung-Dao Lee Institute/N6F-N631 - Smart Classroom (Tsung-Dao Lee Institute)

Tsung-Dao Lee Institute/N6F-N631 - Smart Classroom

Tsung-Dao Lee Institute

Also at Room 603, New Science Building #5, Minhang Campus
15
Description

点击链接入会,或添加至会议列表:

https://meeting.tencent.com/p/7659960274

#腾讯会议:765-996-0274

会议密码:2025

    • 10:00 10:10
      Status 10m
      Speaker: Jun Wei Lok (TDLI, SJTU)
    • 10:10 10:20
      Status 10m
      Speaker: Zelin Yan (TDLI, SJTU)
    • 10:20 10:30
      Status 10m
      Speaker: Bai-Hong Zhou (TDLI, SJTU)
    • 10:30 10:40
      Status 10m
      Speaker: Xuliang Zhu (TDLI, SJTU)
    • 10:40 10:50
      Status 10m
      Speaker: Zhiyu Zhao (TDLI, SJTU)
    • 10:50 11:00
      Status 10m
      Speaker: Danning Liu (TDLI, SJTU)
    • 11:00 11:10
      Status 10m
      Speaker: Qibin LIU (TDLI, SJTU)
    • 11:10 11:20
      Status 10m
      Speaker: Ngoc Khanh Vu (TDLI, SJTU)

      Run-3 ggHyyd:

      • performed combination with Run-2 VBF and ZH using new Run-3 ggF workspace with new data-driven e~>y bkg and its fake-factor syst implemented. 
      • Documenting combination results to the INT note.

      GW-collider:

      • discussing with VQ, preparing up-to-date measurement of H->yy for VQ to redo the Chi squared fit. 
    • 11:20 11:30
      Status 10m
      Speaker: Rui Yuan (TDLI, SJTU)

      DarkSHINE:

      simulation: implement some several tests for understanding the possible direction for HCAL/side-HCAL geometry optimization

      CEPC:

      GS unit test: light yield test with cosmic ray and Cs137

      1. cosmic ray: validate the LY with one 3*3mm2 SiPM and ESR/Tyvek/Teflon, in our lab the difference between ESR/Teflon could reach 20%
      2. Cs137: LY is small and hard to be distinguished from noise

      simulation: scan the attenuation length and LY to check the energy resolution, with several SiPM choice

      ATLAS:

      Hyy*: validate the categorization and singal PDF with HGAMTool and further implement the bkg modeling test

      Hzy: prepared note for unblinding approval

      H2a4b: work with Zelin for checking new regions designed for ttbar CR

      Taking shift during this week

    • 11:30 11:40
      Status 10m
      Speaker: Haidar Mas'ud Alfanda (TDLI, SJTU)
      1. Reconcile the discrepancy in the CalcHEP cross section. Jing was using fb, while the CalcHEP output is in pb.
      2. Massive jobs for the simulation are running in the inpac cluster.
    • 11:40 12:30
      REU: Undergrad Research Discussions
      • 11:40
        Status 10m
        Speaker: Peixu Teng (SPA, SJTU)
      • 11:50
        Status 10m
        Speaker: Linjing Duan (Sun Yat-sen University, Shenzhen Campus (CN) & TDLI/SJTU (CN))
      • 12:00
        Status 10m
        Speaker: Kang Yu (Jilin University(JLU) & TDLI/SJTU)

        I have finished writing my dissertation and found appropriate LaTeX template. Recently I have been working on typesetting.

        Original .tex files are available at yorkrr/jluthesis at firstversion

         

        For ADCoS, I have finished the shifter setup process and been able to book my first shift in Operation Task Planner(OTP).