[2025-01-18] For better promotion of the events, the categories in this system will be adjusted. For details, please refer to the announcement of this system. The link is https://indico-tdli.sjtu.edu.cn/news/1-warm-reminder-on-adjusting-indico-tdli-categories-indico
A Muon station for sciEnce, technoLOgy and inDustrY (MELODY) has been listed in the CSNS II upgrade plan, and the infrastructure construction is scheduled to start by the end of 2023. Up to 5Hz of proton pulses will be extracted from the RCS ring to a stand-alone target station. One surface muon and one decay muon beamline are designed to provide multi-terminals for applications. In this...
Charged lepton flavor violation (CLFV) is a clear signature of possible new physics beyond the standard model. By exploiting a typical example model of extra Z^{\prime} gauge boson, we perform a detailed comparative study on CLFV searches at several future lepton colliders, including a 240 GeV electron-positron collider and a TeV scale muon collider. Based on detailed signal and background...